The Design Build Operation (DBO) Contract Comprising River Water intake, Raw Water Pipeline, and a 500 MLD WTP

Posted on: December 5th, 2022 by admin

The Design Build Operation (DBO) Contract Comprising River Water intake, Raw Water Pipeline, and a 500 MLD WTP, Detailed Design, Supervision of Construction works of Two Pipeline Packages under Dhaka Environmentally Sustainable Water Supply Project under DWASA